King’s College School is a leading and historic independent school. The development was a new 6-lane 25m indoor swimming pool to replace the existing outdated facility. This also included a…
Category:
New Barnet Leisure Centre in North London has become the second new facility to open its doors following a £44.9m investment by Barnet London Borough Council (BLBC). FT Leisure delivered the swimming pool water treatment and filtration systems for the 25m 6 lane pool and learner pool.
Category:
25m 6 lane main pool. FT Leisure designed and installed the water treatment and filtration system.
Category: