St. Sidwell’s Point
Client:
Exeter City Council
Contractor:
Kier Construction
Architect:
Space + Place Architects and Gale & Snowden Architects Ltd
Date:
22nd June 2022
Opened in April 2022, St Sidwell’s Point is the UK’s first leisure centre built to the super energy efficient Passivhaus standard, meaning energy consumption is reduced by 70% when compared with industry best practice standards.
The first installation of FT Leisure’s FTMicron4 ceramic water treatment and filtration system which supports the 25m 8 lane Competition pool, Hydro pool with air and water massage features, confidence water for little ones, water and air features, and moveable floor. Due to ultra-filtration, the pools have exceptional water quality with minimal chemical content, which will greatly improve the experience for swimmers compared to a standard pool.