Plymouth Life Centre

Contractor:
Balfour Beatty

Architect:
Archial Architects

Date:
2nd May 2012

POOL SYSTEMS:

  1. 50m 10 lane FINA competition pool
  2. Competition diving pool for 10m platform, complete with pneumatic diver training system
  3. Freeform leisure pool complete with:
    1. GRP ride
    2. Water features
    3. Air features
  4. Spa pool with water and air features

FTL SERVICES:

Design, supply, installation and commissioning:

4No Water treatment and filtration systems

Pneumatic diver training system

Water features

Air features

Ride hydraulics

 

COMMERCIAL:

Project value: £42m

FTL sub-contract: £0.95m

 

PROJECT TEAM:

Client: Plymouth City Council

Principal Contractor: Balfour Beatty

Architect: Archial Architects

Engineer: Arup UK

Pool consultant: Devin Consulting

 

OTHER INFORMATION:

Project completion: Oct 2012

(function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){ (i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o), m=s.getElementsByTagName(o)[0];a.async=1;a.src=g;m.parentNode.insertBefore(a,m) })(window,document,'script','https://www.google-analytics.com/analytics.js','ga'); ga('create', 'UA-6035829-1', 'auto'); ga('send', 'pageview');