Plymouth Life Centre
Contractor:
Balfour Beatty
Architect:
Archial Architects
Date:
2nd May 2012
POOL SYSTEMS:
- 50m 10 lane FINA competition pool
- Competition diving pool for 10m platform, complete with pneumatic diver training system
- Freeform leisure pool complete with:
- GRP ride
- Water features
- Air features
- Spa pool with water and air features
FTL SERVICES:
Design, supply, installation and commissioning:
4No Water treatment and filtration systems
Pneumatic diver training system
Water features
Air features
Ride hydraulics
COMMERCIAL:
Project value: £42m
FTL sub-contract: £0.95m
PROJECT TEAM:
Client: Plymouth City Council
Principal Contractor: Balfour Beatty
Architect: Archial Architects
Engineer: Arup UK
Pool consultant: Devin Consulting
OTHER INFORMATION:
Project completion: Oct 2012