Liverpool FC Training Centre

Client:
Liverpool FC

Contractor:
McLaughlin & Harvey

Architect:
KSS

Date:
5th August 2024

FT Leisure have designed, supplied and installed the swimming technology for the impressive new Liverpool FC Axa Training centre. our services include the water treatment and filtration systems and all the pool tanks, working in association with our partners, Myrtha Pools.  There are 6No pools in total, providing training, rehabilitation and relaxation for the 1st team and academy players.

 

The pools provided include:

  • Hydrotherapy Pool
  • Hydroworx 2000 series pool
  • Hot pool
  • Cold pool
  • 2No cold plunge pools (in 1st team changing rooms)

All the pools are served with medium rate sand filtration, combined with traditional disinfection systems, UV and ph control chemicals. The pool tanks are stainless steel modular pool tanks, with mosaic tiled finishes. The Hydroworx pool is  stainless steel pool with liner system and integrated underwater treadmill.

(function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){ (i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o), m=s.getElementsByTagName(o)[0];a.async=1;a.src=g;m.parentNode.insertBefore(a,m) })(window,document,'script','https://www.google-analytics.com/analytics.js','ga'); ga('create', 'UA-6035829-1', 'auto'); ga('send', 'pageview');