Center Parcs Whinfell

Client:
Center Parcs

Contractor:
SDC Construction

Architect:
Holder Mathias Architects

Date:
23rd March 2023

The design, supply and installation of the water treatment and filtration system and pumping systems for the exciting new cyclone ride at CP Whinfell. The ride was designed and installed by Van Egdom.

(function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){ (i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o), m=s.getElementsByTagName(o)[0];a.async=1;a.src=g;m.parentNode.insertBefore(a,m) })(window,document,'script','https://www.google-analytics.com/analytics.js','ga'); ga('create', 'UA-6035829-1', 'auto'); ga('send', 'pageview');