Beckenham Spa

Client:
Bromley Mytime

Architect:
LA Architects

Date:
10th February 2021

FT Leisure were appointed to carry out the refurbishment of the 20m x 8m moveable floor system in the training pool at The Spa, Beckenham. The Aquaterr moveable floor system, an FT Leisure product, was originally installed in 1997. Over the 23 years of use, the surface panels had discoloured and needed replacement.

The hydraulic operating systems were also fully refurbished as part of the project.

All the work was carried out by our skilled in-house fabrication engineers.

(function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){ (i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o), m=s.getElementsByTagName(o)[0];a.async=1;a.src=g;m.parentNode.insertBefore(a,m) })(window,document,'script','https://www.google-analytics.com/analytics.js','ga'); ga('create', 'UA-6035829-1', 'auto'); ga('send', 'pageview');