Berwick Leisure Centre Project Awarded

Tolent Construction Limited started work on phase one in January 2020, which includes a new swimming pool and fitness suite, and is due to open in March 2021. The new centre is expected to be completely open to the public in summer 2022.

Designed by GT3 Architects, the new centre will feature a five-lane, 25m swimming pool, a teaching pool and leisure pool and spa facilities.

FT Leisure have been appointed to supply and install the water treatment and filtration systems, hyrdraulics and controls for the leisure pool features, learner pool moveable floor, self depositing steps, submersible boom and filtration for the spa pool.

Author:
Emma Glyn-Jones

Category:

Date:
25th March 2020

(function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){ (i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o), m=s.getElementsByTagName(o)[0];a.async=1;a.src=g;m.parentNode.insertBefore(a,m) })(window,document,'script','https://www.google-analytics.com/analytics.js','ga'); ga('create', 'UA-6035829-1', 'auto'); ga('send', 'pageview');